Advitech helped a coal-handling and preparation plant to design and construct modifications to their flotation and dewatering circuits. The cost of the project was repaid within six months thanks to the resulting increase in saleable product and reduction in tailings disposal costs.
We understand how important it is that staging systems operate safely and reliably, every time. Our chartered mechanical, structural and electrical engineers work alongside theatre consultants, technicians and original equipment manufacturers to ensure staging systems are designed and built to standard, giving venue operators confidence in their integrity. Our environment and sustainability specialists can also assist with planning assessments, noise management, energy auditing and energy efficiency.