We can help the Liquid Natural Gas industry across many different aspects of their operations.
Trusted by:
Woodside, Chevron
We can help the Liquid Natural Gas industry across many different aspects of their operations.
Woodside, Chevron
A fabrication company needing analysis and certification for proposed modifications to existing structural steelwork in a coal washery.
Advitech provided practical, operationally relevant guidance to strengthen the client’s security posture without disrupting production or overwhelming internal teams.
Advitech managed all aspects of Aboriginal and historic heritage management for a $1.7 billion expressway construction project.
Vehicles transported to site on truck haulage beds must be appropriately restrained to the bed and restraint systems must comply with the Heavy Vehicle National Law and Load Restraint Guide. Advitech can provide clients with guidelines for appropriate and compliant restraints.
Advitech was engaged by a staging equipment supplier to provide independent third party engineering design verification for their specialised hoisting and lifting equipment, as part of a major upgrade at a prominent Sydney opera and theatre venue.
Akaysha Energy approached Advitech to conduct a fire safety study report prior to commencing construction of the Waratah Super Battery, one of the largest committed battery projects in the southern hemisphere and most powerful battery in the world.
Advitech’s process engineers conducted process safety audits for a large water utility. Numerous process safety gaps were identified ranging from simple fixes to possible major environmental issues arising from inadequate chemical storage. Advitech’s recommendations and implementation program identified practical solutions to improve efficiency and enhance process safety across the organisation.
Advitech’s environmental team provided an independent evaluation of water treatment system options for a new purpose-built dairy processing facility.
A regional water facility partnered with Advitech to verify its emergency stop system before a major pump upgrade. The system was assessed against AS4024.1503 and NSW WHS regulations, with expert recommendations delivered in just three weeks. The result: verified compliance, improved reliability, and safer outcomes for frontline workers. Read the full article to learn more.