Advitech works with resources recovery and waste management facilities to ensure they comply with local, state and federal regulations, legislation, guidelines and infrastructure plans, as well as meet the environmental expectations of the community.
Sectors
Recycling and Sustainability
Complying with environmental regulations and meeting community expectations
Our services:
Get in touch >
Predictive Site Survey achieves excellent results
Going with the flow: upgrading the ventilation system for Australia’s largest aluminium smelter
Advitech’s process engineers assisted Tomago Aluminium with smelter ventilation and pollution abatement issues. Our computer flow model enabled the design of a potline ventilation system which is flexible, stable and balanced, giving our client more control over their production line and better able meet their environmental protection obligations.
Certification of highly complex structures
A fabrication company needing analysis and certification for proposed modifications to existing structural steelwork in a coal washery.
Drone Inspections | Send in the drones
Inspection of assets by drone avoids the constraints of working at heights, such as time, expense, risk and compliance issues.
Engineering design and certification of davit cranes
Advitech’s engineering team successfully designed and certified two custom davit cranes for installation atop a 40m high storage tank for one of Australia’s leading energy companies.
Digital twinning of production process – Manages risk and cuts cost
Simulation Modelling Services (SMS) is using ‘digital twinning’ to help a global pharmaceutical giant to optimise its manufacturing processes.
Driving success for business safety
Novecom’s smart radar system – Intercepta – provided a Brisbane manufacturing logistics provider with a means to reduce speeding events on its site and improve personnel safety as a result. Interceptas intelligent software provided advanced analytics and customised reports to support HSE managers to monitor compliance and improve safety.
Increased recovery of saleable coal at a coal preparation plant
Advitech helped a coal-handling and preparation plant to design and construct modifications to their flotation and dewatering circuits. The cost of the project was repaid within six months thanks to the resulting increase in saleable product and reduction in tailings disposal costs.
Environmental impact study benefits from real-time data
Novecom’s SynaptiX collector is certainly a versatile device, as demonstrated in January 2021 when it was paired with a ‘song meter’ for an environmental impact study looking at the behaviour of bats.